The item carrying your biggest increase, taken apart before the increase lands.
Most of you are building next year’s price plan right now. Somewhere in that plan is one item carrying more of the increase than any other. This week you’re going to find out what that increase actually is. Part of it is the item finally covering what it costs you. Part of it is a claim on value the Guest hasn’t granted yet. Most plans can’t tell the two apart, so they price both the same way. By Friday you’ll have one sheet for one item that tells you which is which and what to do about each.
The Move
Find the item carrying the biggest increase. Build its floor at your slowest cycle, split the planned increase into floor and value, and take the value question to the cast before the price moves.
The Asset
Your price plan. The recipe costing for the item. Twelve months of P&L. Twelve months of covers by week from your POS. Item sales by week for the item. Fifteen minutes of two pre-shifts.
Everything here runs on one stack. Price is Base plus X plus V. Base is the plate cost, what goes on the plate. X is everything else it takes to get that plate to the table and keep the operation running as designed: labor, rent, utilities, insurance, card fees, marketing, equipment, maintenance, licensing, the margin to maintain the design, and the owner’s return. Base plus X is the floor. Below it you aren’t discounting, you’re bleeding. V is the value premium above the floor, and only the Guest sets it.
Part 1: Find The Item
Biggest increase means dollars, not percent. For every main plate in the plan, multiply the planned price change by what the item sells in an average week. Sort high to low. The item at the top is the one your plan is counting on most.
Run this on main plates. A main plate carries the cover, so it carries the cover’s share of X. Drinks and sides get their own edition.
If your plan is the same percentage on everything, you don’t have a plan, you have a multiplier. Run the item at the top anyway. What you find on it is what’s sitting under every other line.
Part 2: Build The Floor At Your Slowest Cycle
Step 1: Re-cost the plate. Don’t trust the costing card. Re-cost it from your last two invoices at today’s prices, every component, every garnish, every portion as actually plated, not as written. That’s the Base.
Step 2: Find your lowest demand cycle. From twelve months of covers by week, find the slowest regular stretch of the year, usually a month. Regular means it happens every year. A week you were closed for a storm or a repair doesn’t count.
Step 3: Calculate X per cover at that cycle. Take that month’s P&L and add up every operating cost except food: labor with taxes and benefits, rent, utilities, insurance, card fees, marketing, equipment, maintenance, licensing. Add the maintenance margin you need to keep the design running, and the owner’s return. If you don’t pay yourself a return, X is lying to you, so put the number in. Divide the total by that month’s covers. That’s X per cover at your slowest cycle.



